Lien deadlines · United States
Mississippi lien deadlines (2026)
In Mississippi, the lien must be filed within 90 days from the last day you furnish, under Miss. Code § 85-7-405(1)(b).
The short answer
- File the lien: within 90 days from the last day you furnish (Miss. Code § 85-7-405(1)(b).
- Send the preliminary notice — Subcontractor / Supplier: within 30 days from the first day you furnish (Miss. Code § 85-7-407.
- Start the enforcement action: within 180 days from the day the lien is recorded (Miss. Code § 85-7-421 (§85-7-423).
Every Mississippi deadline
| Rule | Who | Window | Clock starts | If missed | Statute |
|---|---|---|---|---|---|
| Preliminary notice | Subcontractor / Supplier | 30 days | from the first day you furnish | Right lost | Miss. Code § 85-7-407 |
| Lien filing | All claimants | 90 days | from the last day you furnish | Right lost | Miss. Code § 85-7-405(1)(b) |
| Enforcement (suit) | All claimants | 180 days | from the day the lien is recorded | Right lost | Miss. Code § 85-7-421 (§85-7-423) |
Window = the statutory limit. Clock starts = the event the window runs from. Statute links open the code text on a public legal source.
Statute notes
Verbatim notes from the verified dataset, with dataset shorthand removed. Read the statute before you rely on them.
- Preliminary notice §85-7-407(2): within 30 days after first delivery, written notice to the contractor (or owner if no contractor) — failure forfeits lien rights. EXCEPTION §85-7-407(4): does not apply to single-family residential construction.
- Lien filing §85-7-405(1)(b): file the claim of lien for record within 90 days of last work/materials. The lien must carry the statutory expiration statement + notice of right to contest, and a true copy must reach the owner within 2 business days — omissions invalidate it.
- Enforcement (suit) §85-7-421: commence the payment action within 180 days of filing the lien or it is unenforceable. Contest trap §85-7-423: if the owner records a notice of contest, the lien dies at the earlier of 90 days after the contest or 180 days from filing.
Never miss a Mississippi deadline again
Deadline 365 reads your job sheet every morning and tells you which notice or lien window is closing — for Mississippi and every other jurisdiction you work in. Every plan includes the 18-document lien pack.