Lien deadlines · United States
Indiana lien deadlines (2026)
In Indiana, the lien must be filed within 60 days from the last day you furnish, under Ind. Code § 32-28-3-3(b)(2).
The short answer
- File the lien: within 60 days from the last day you furnish (Ind. Code § 32-28-3-3(b)(2).
- Preliminary notice — Subcontractor / Supplier: §32-28-3-9(b): a sub/journeyman/laborer/equipment lessor must give the owner written notice of the claim to charge the owner; no fixed window. A pre-work notice (f) covers post-notice work; owner liability is capped at amounts due from the owner to the employer/lessee (d). (Ind. Code § 32-28-3-9.
- Start the enforcement action: within 1 year from the day the lien is recorded (Ind. Code § 32-28-3-6.
Every Indiana deadline
| Rule | Who | Window | Clock starts | If missed | Statute |
|---|---|---|---|---|---|
| Preliminary notice | Subcontractor / Supplier | no fixed window | from the first day you furnish | Claim limited | Ind. Code § 32-28-3-9 |
| Lien filing | Class 2 structure | 60 days | from the last day you furnish | Right lost | Ind. Code § 32-28-3-3(b)(2) |
| Lien filing | Standard structure | 90 days | from the last day you furnish | Right lost | Ind. Code § 32-28-3-3(a)(2) |
| Enforcement (suit) | All claimants | 1 year | from the day the lien is recorded | Right lost | Ind. Code § 32-28-3-6 |
Window = the statutory limit. Clock starts = the event the window runs from. Statute links open the code text on a public legal source.
Statute notes
Verbatim notes from the verified dataset, with dataset shorthand removed. Read the statute before you rely on them.
- Preliminary notice §32-28-3-9(b): a sub/journeyman/laborer/equipment lessor must give the owner written notice of the claim to charge the owner; no fixed window. A pre-work notice (f) covers post-notice work; owner liability is capped at amounts due from the owner to the employer/lessee (d).
- Lien filing §32-28-3-3(b)(2): Class 2 structure (or auxiliary improvement) — file the sworn statement within 60 days of last labor/materials. Standard structures: 90 days (see row). The split is by structure class, not by role.
- Lien filing §32-28-3-3(a)(2): file the sworn statement in duplicate in the county recorder's office within 90 days of last labor/materials (Class 2 structures: 60 days).
- Enforcement (suit) §32-28-3-6: suit within 1 year after recording the statement (or after an agreed credit expires); otherwise the lien is void.