Lien deadlines · United States

Indiana lien deadlines (2026)

In Indiana, the lien must be filed within 60 days from the last day you furnish, under Ind. Code § 32-28-3-3(b)(2).

4 rules Verified 2026-10-13Dataset confidence A Informational only — not legal advice How we verify

The short answer

  • File the lien: within 60 days from the last day you furnish (Ind. Code § 32-28-3-3(b)(2).
  • Preliminary notice — Subcontractor / Supplier: §32-28-3-9(b): a sub/journeyman/laborer/equipment lessor must give the owner written notice of the claim to charge the owner; no fixed window. A pre-work notice (f) covers post-notice work; owner liability is capped at amounts due from the owner to the employer/lessee (d). (Ind. Code § 32-28-3-9.
  • Start the enforcement action: within 1 year from the day the lien is recorded (Ind. Code § 32-28-3-6.

Every Indiana deadline

RuleWhoWindowClock startsIf missedStatute
Preliminary noticeSubcontractor / Supplierno fixed windowfrom the first day you furnishClaim limitedInd. Code § 32-28-3-9
Lien filingClass 2 structure60 daysfrom the last day you furnishRight lostInd. Code § 32-28-3-3(b)(2)
Lien filingStandard structure90 daysfrom the last day you furnishRight lostInd. Code § 32-28-3-3(a)(2)
Enforcement (suit)All claimants1 yearfrom the day the lien is recordedRight lostInd. Code § 32-28-3-6

Window = the statutory limit. Clock starts = the event the window runs from. Statute links open the code text on a public legal source.

Statute notes

Verbatim notes from the verified dataset, with dataset shorthand removed. Read the statute before you rely on them.

  • Preliminary notice §32-28-3-9(b): a sub/journeyman/laborer/equipment lessor must give the owner written notice of the claim to charge the owner; no fixed window. A pre-work notice (f) covers post-notice work; owner liability is capped at amounts due from the owner to the employer/lessee (d).
  • Lien filing §32-28-3-3(b)(2): Class 2 structure (or auxiliary improvement) — file the sworn statement within 60 days of last labor/materials. Standard structures: 90 days (see row). The split is by structure class, not by role.
  • Lien filing §32-28-3-3(a)(2): file the sworn statement in duplicate in the county recorder's office within 90 days of last labor/materials (Class 2 structures: 60 days).
  • Enforcement (suit) §32-28-3-6: suit within 1 year after recording the statement (or after an agreed credit expires); otherwise the lien is void.