Lien deadlines · United States

Illinois lien deadlines (2026)

In Illinois, the lien must be filed within 4 months from the last day you furnish, under 770 ILCS 60/1 et seq.

4 rules Verified 2026-10-13Dataset confidence A Informational only — not legal advice How we verify

The short answer

  • File the lien: within 4 months from the last day you furnish (770 ILCS 60/1 et seq..
  • Send the preliminary notice — Subcontractor / Supplier: within 60 days from the last day you furnish (770 ILCS 60/1 et seq..
  • Start the enforcement action: within 2 years from the day the lien is recorded (770 ILCS 60/1 et seq..
  • Watch the acceleration rule: within 30 days from project completion — a recorded notice can shorten every window above.

Every Illinois deadline

RuleWhoWindowClock startsIf missedStatute
Preliminary noticeSubcontractor / Supplier60 daysfrom the last day you furnishClaim limited770 ILCS 60/1 et seq.
Lien filingAll claimants4 monthsfrom the last day you furnishRight lost770 ILCS 60/1 et seq.
Enforcement (suit)All claimants2 yearsfrom the day the lien is recordedRight lost770 ILCS 60/1 et seq.
Acceleration ruleAll claimants30 daysfrom project completionContext only770 ILCS 60/34

Window = the statutory limit. Clock starts = the event the window runs from. Statute links open the code text on a public legal source.

Statute notes

Verbatim notes from the verified dataset, with dataset shorthand removed. Read the statute before you rely on them.

  • Preliminary notice In Illinois, a preliminary notice is only required on owner-occupied, single-family residential jobs.
  • Lien filing 4 months; Original contractor: file within 4 months
  • Acceleration rule A Section 34 notice gives you 30 days to start enforcement, or the lien is forfeited. The owner or lender may also not be served with your action.

Never miss an Illinois deadline again

Deadline 365 reads your job sheet every morning and tells you which notice or lien window is closing — for Illinois and every other jurisdiction you work in. Every plan includes the 18-document lien pack.

Lien deadlines in every jurisdiction