Lien deadlines · United States

Maine lien deadlines (2026)

In Maine, the lien must be filed within 90 days from the last day you furnish, under 10 M.R.S. § 3253.

3 rules Verified 2026-10-13Dataset confidence A Informational only — not legal advice How we verify

The short answer

Every Maine deadline

RuleWhoWindowClock startsIf missedStatute
Preliminary noticeSubcontractor / Supplierno fixed windowfrom the first day you furnishContext only10 M.R.S. § 3253(1)(B)
Lien filingAll claimants90 daysfrom the last day you furnishRight lost10 M.R.S. § 3253
Enforcement (suit)All claimants120 daysfrom the last day you furnishRight lost10 M.R.S. § 3255(1)

Window = the statutory limit. Clock starts = the event the window runs from. Statute links open the code text on a public legal source.

Statute notes

Verbatim notes from the verified dataset, with dataset shorthand removed. Read the statute before you rely on them.

  • Preliminary notice No preliminary notice. But the lien statement must be filed in the registry of deeds AND mailed to the owner within the same 90 days (§3253(1)(B)); an owner who paid the GC before notice is only liable to the extent of the balance (§3255(3)).
  • Lien filing §3253: the lien dissolves unless within 90 days after ceasing work/materials the claimant files a true statement of the amount due in the county registry of deeds AND mails a copy to the owner (both steps, same 90 days).
  • Enforcement (suit) §3255(1): the enforcement action must be filed within 120 days after the last labor/materials are furnished — the clock runs from last furnishing, not from recording; the only extension is §3256 (owner death/bankruptcy).

Never miss a Maine deadline again

Deadline 365 reads your job sheet every morning and tells you which notice or lien window is closing — for Maine and every other jurisdiction you work in. Every plan includes the 18-document lien pack.

Lien deadlines in every jurisdiction