Lien deadlines · United States

Arizona lien deadlines (2026)

In Arizona, the lien must be filed within 120 days from the last day you furnish, under A.R.S. § 33-981 et seq.

5 rules Verified 2026-10-13Dataset confidence C Informational only — not legal advice How we verify

The short answer

  • File the lien: within 120 days from the last day you furnish (A.R.S. § 33-981 et seq..
  • Send the preliminary notice — Subcontractor / Supplier: within 20 days from the first day you furnish (A.R.S. § 33-981 et seq..
  • Start the enforcement action: within 6 months from the day the lien is recorded (A.R.S. § 33-981 et seq..
  • Watch the acceleration rule: within 60 days from project completion — a recorded notice can shorten every window above.

Every Arizona deadline

RuleWhoWindowClock startsIf missedStatute
Preliminary noticeSubcontractor / Supplier20 daysfrom the first day you furnishRight lostA.R.S. § 33-981 et seq.
Lien filingGC120 daysfrom the last day you furnishRight lostA.R.S. § 33-981 et seq.
Lien filingSub60 daysfrom the last day you furnishRight lostA.R.S. § 33-981 et seq.
Enforcement (suit)All claimants6 monthsfrom the day the lien is recordedRight lostA.R.S. § 33-981 et seq.
Acceleration ruleAll claimants60 daysfrom project completionContext onlyA.R.S. 33-993

Window = the statutory limit. Clock starts = the event the window runs from. Statute links open the code text on a public legal source.

Statute notes

Verbatim notes from the verified dataset, with dataset shorthand removed. Read the statute before you rely on them.

  • Preliminary notice Arizona requires subcontractors to send a 20-Day Preliminary Notice within 20 days of first furnishing
  • Acceleration rule Watch out: if the owner does not record and post a Notice of Ownership, your filing window drops from 120 days to 60 days.

Never miss an Arizona deadline again

Deadline 365 reads your job sheet every morning and tells you which notice or lien window is closing — for Arizona and every other jurisdiction you work in. Every plan includes the 18-document lien pack.

Lien deadlines in every jurisdiction